UBAID ULLAH

Address: Muslim Nagar, Raiwind road Lahore, Contact: +923457156071
Email: Shubaid990@gmail.com,

LinkedIn: https://www.linkedin.com/in/ubaid-ullah-427192a7/

A dynamic consultant with more than 16 years hands-on experience of diverse operations, consulting, and trainings with private and multinational companies. After 16 years of enriched experience in FMCG, chemical and home appliances industries, in diverse roles and areas, I always welcome a new challenging initiative to prove my worth.

WORK HISTORY (2005– 2016)

More than 11 years have worked in companies like Ittehad chemicals, Haleeb Foods, Engro Foods and Coca-Cola Beverages Pakistan limited, as an employee in different capacities.

2016 –TILL TODAY

From 6 years, have been working as a consultant and helping companies to reach their goals like; MEX
(Manufacturing Excellence), Lean Management, TPM Implementation, Productivity, Reliability, Lean
maintenance, Management control and reporting system (MCRS), Visual Management and Training
employees on technical skills and soft skills as well. My work as a consultant has positively influenced
several companies.

In management consulting worked with CEO’s and directors to make their mission and vision come true.
Following are the roles I have been performing;
• Responsible to positively impact Maintenance Management
• Responsible to positively impact Performance Management
• Responsible to positively impact Productivity
• Responsible to implement short interval controls (SIC)
• Responsible to positively impact KPI’s and reporting mechanism
• Responsible to implement TPM/Lean as an initiator and facilitator
• Training Employees Soft Skills and Technical Skills

• Designed and implemented Total productive maintenance (TPM) Program at Haier Private limited
(2018-2020)
• Implemented SMED (Single minute exchange of dies) and reduced change over time to 72% at
bottleneck equipment at Haier private limited (2020)
• A year long HSE Program at Haier Private limited (2016-17)
• Six Months HSE Program at Indus Fan Private limited (2017)
• New Factory Installation and commissioning project at Indus Fan (2019)

RECENT CONSULTING PROJECT WITH TA COOK (Oct 2020 –
Dec 2021)
• MEX project with ‘TACOOK’ in INGREDION (Rafhan Maize)
• Areas of Impacts/Influence In INGREDION
o Designed and executed Performance Management at two plants
o Implemented resource optimization for cost smart objective
o Developed departmental KPIs including Productivity
o Implemented Change Management at two plants
o Implemented Mindset & Behavior strategies

  • BACHELOR OF TECHNOLOGY (CHEMICAL), ISLAMIA UNIVRERSITY BAHAWALPUR IN 2011
  • Boiler Engineering LEVEL-1 (BOILERS & PRESSURE VESSELS COMPETENCY EXAM)
  • Project Management
  •  Re-engineering (Design skills)
  •  Change Management
  •  TNA (Training need assessment)
  • Maintenance Management
  •  Peak performance
  •  Activity Based Training
  •  Analytical & Problem-Solving skills

• MEX
• TPM
• Performance Management
• SMED (Single Minute Exchange of Dies or
Quick Changeover)
• Maintenance management & Reliability
• Trainings

Topics Platform Country
Preventive Maintenance Haier Hard Skills Development
FMEA and Breakdown Analysis Haier Hard Skills Development
Visual Management NPO Hard Skills Development
Creativity and Design Thinking NPO Soft Skills Development
SMED NPO Hard Skills Development
Problem Solving Strategies NPO Soft Skills Development
Active Supervisory Behaviors Rafhan Maize Soft Skills Development
Change Management Rafhan Maize Soft Skills Development
Time Management for Success Rafhan Maize Soft Skills Development
KPIs and Digital Reporting Systems Rafhan Maize Soft Skills Development
Coaching and Peak Performance Rafhan Maize Soft Skills Development

Accomplished Projects as a Consultant
TPM Tangible Results: 2018 vs 2019
We started off from scratch at manufacturing facility regarding “Total Productive Maintenance
and after a year succeeded to reap remarkable results in compliance and culture, both.
Following is the summary of the results.

 

 

No. Activity Objective What Company Achieved
Results Scope Before After
1 Master Preventive Maintenance Plan To decrease breakdowns, to increase reliability of the equipment and Increasing productivity No. of Failures 117/Month 52/Month 55% Improved
2 Autonomous
Maintenance
To Increase floor champion’s
autonomy by developing
competencies and enhancing
productivity consequently
Skill level 30% 60%
3 MTBF To increase Mean Time Between
Failure to Increase reliability
MTBF In
Minutes
10750 Min 12429 Min
4 MTTR To decrease Mean Time To Repair to
Increase reliability
MTTR in
Minutes
86 48.35
5 Machine Availability To Increase availability for better OEE
(Overall Equipment Efficiency)
Availability 85.50 % 90.80 %
6 Changeover Time of
Bottleneck Equipment
To decrease setup/Changeover losses Setup Time 83 Min 23 Min
7 Visual Management To make the facility visually
organized and self-sustained
VM
Strategies
NO Base A
Substantial
Difference
SMED Project at Haier (Single Minute Exchange of Dies) Results: 2019 vs 2020
# Description Standard Unit Before After
1 Model changeover time N/A Mins 83 23
2 Capacity 500 No’s 422 479
3 UPMH 31 No’s 26 30